Monday, January 3, 2011

Paine Field January 3


A 30 minute maintenance engine run is begun on N787BA. Scheduled to leave for Boeing Field this afternoon, it is still on the ground at 0230z.




N7874 landed, parked on the Boeing ramp for 40 minutes, then departed for Tatoosh before returning to Boeing Field.




BOEING 522 747-8F N50217 departed Boeing Field this morning and worked in the north flutter track. On takeoff, a seagull struck the number two engine and T-38 N38FT was launched to check for damage.


No comments:

Post a Comment

Note: Only a member of this blog may post a comment.